Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Layers: | Single-Layer |
Still deciding? Get samples of US$ 10/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
metal building Steel Fabrication Structure Warehouse building
Steel Structure Components | ||
Main Frame | Main Beam | Hot Rolled H Beam, Buildup H Beam,Q235B/Q355B Grade Steel |
Secondary Beam | ||
Main Column | ||
Wind-resistance Column | ||
Secondary Frame | Tie Bar | Round Pipe |
Bracing | Steel Angle Bar/Round Bar,X-bracing | |
Purline | C/Z Section Pre-galvanized Steel | |
Hanger Rod | 12mm Galvanized Round Bar | |
Knee Brace | 50x5EA | |
Roof and Wall System | Roof Panel | Single Corrugated Steel Sheeting,PU Sandwich Panel,Glass Wool Sandwich Panel,EPC |
Wall Panel | ||
Skylight Panel | 2mm Thickness FPR |
Window | PVC/Plastic Steel/Aluminum Window | |
Door | Electric/Hand Roller Door/Walk Door etc | |
Gutter | Galvanized/Stainless Steel Gutter | |
Downpipe | PVC/Aluminum Downpipe | |
Ventilating System | Exhaust Fan etc | |
Bolts | Anchor Bolts,High Strength Bolts,Normal Bolts |
Design code : GB50017-2014;CECS102:2012;GB50009-2012; GB50011-2010
Wind load : Max. 350km/h
Seismic load : Level 7
Roof live load: 0.5kn/m2
External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
Mezzanine floor load: 150 kg/m2
Live load of corridor is 2.0kn/ m2
Quality Control |
QC processing:
1. Every 3 months meeting for Quality Audit to solve the weakness during processing and procedures
2. Every 6 months meeting for employee training.
3. Producing as to the International Steel Structure Standard with ISO 9001 Quality Control System
4. Each project, every 6 months, connecting with clients for feedback and complaints, then improve the quality control actions.
5. Quality inspection report for every process during production. Ensure 100% good quality products.